Para.20. When I visited the North Face of the Tunnel
I was informed that a contract had been let
for a certain building in course of erection
because it had been found impossible to get
it done otherwise. From the accounts, I
gathered that a great many men were working
day-work dressing stone. I do not think I
an wrong in this.
adt no arotosIjnoo edt tadt waso erit 1 el
ert no bisq era molto#2 #I DI - 09 IST
$ toga
-etste aasIbmwong vietuloads Tedtons et RiNT .21 .STST
bereblero0 eis ered edtow olidv¶ quo .Jnna-
mert bettelv øved ofw ereenign galbsef yd
.basign at adrow tsltata of Isupe eď ot
- afro stidu¶ edi vɗ betqobs mejays eft
ent duodquerdt Iserevit et ‡nemtrisq-
.areas to samo edt nt tqaɔxe ymofob
form redw,brsylood e'erlw2 bns bløttrejtv€
bra erutan Istɔsqa vrev a to at row at to
[Iama tev a ntditiw betarźneɔmoo at Ji eradwy
.6789
.8918
Paras.21 to
25
·
When the connection to the North
Tunnel Face was sanctioned, Mr. Eves re-
-presented to me that it was an urgent
matter and I accordingly ordered that the
work should be done under the catchwater
contract. In that contract, the item for
conveying pipes was a small one relatively
.ex of
V
$680 in a contract totalling $108,000
and consequently did not affect it much. It
would have been a perfectly simple matter
to obtain tenders had Kr. Eves not been so
urgent, but I was given to understand that
time was money. Practically all large works
in England are carried out under the same
system as that adopted by the Public Works